Get my agent

Investment committee memo draft

A first-pass IC memo from your deal notes and model outputs, in your firm's usual order.

Last tested 2026-10-19 Its example inputs were run through Claude Haiku 5.5, and an AI judge (Jev) scored the reply 71/100 for following the rules and doing the task.

Your details
⌘ Enter
Prompt previewUpdates as you type

Fill in the required fields, then build your prompt.

Free. Run it here sends the prompt through our server to Claude and shows the draft on this page (5 runs a day free, 100 on a paid plan); we don't store it. Open in ChatGPT, Claude, or Grok sends the prompt to that tool instead. Sign in there first, or the prompt box may come up empty; if it does, use Copy and paste it in.

Example output

I wrote this by hand on 2026-10-19 from the made-up inputs below, to show what a good result looks like. Your results will vary, so read every draft before you use it.

Example inputs
  • Deal summary (property, price, basis): Maple Court, 8 units, $1.05M ($131K/unit)
  • Model outputs you want to show: Projected 5-yr levered IRR 14.2%, equity multiple 1.78x, going-in cap 5.7%, stabilized yield on cost 7.1%
  • Thesis and risks: Renovate 6 units at $12K each to reach $1,250 2BR rents. Risk: renovation costs, slower lease-up, tax reassessment.
Investment committee memo: Maple Court

Recommendation: Approve the acquisition at $1.05M, subject to the open items below.

Deal summary: 8 units for $1.05M ($131K per unit).

Thesis: Renovate 6 units at $12,000 each to push 2BR rents to about $1,250, in line with renovated comps nearby.

Key numbers (projections from the model)
- Going-in cap rate: 5.7%
- Stabilized yield on cost: 7.1%
- 5-year levered IRR: 14.2% (projected)
- Equity multiple: 1.78x (projected)

Risks and mitigants
- Renovation costs run over: get two contractor bids before closing.
- Lease-up is slower than planned: renovate on turnover, not all at once.
- Property taxes get reassessed after the sale: underwrite taxes at the purchase price.

Open diligence items
- Contractor bids
- Tax reassessment estimate

AI drafts can be wrong. Check every fact, name, and number before you send anything. Free: build prompts with no limit and 5 AI runs a day. A paid plan: 100 runs a day, 1,000 checks a day, batch runs for 50 contacts.

More for cre analysts and underwriters